Socket, manual method, RD1

REFERENCES

RD1 Universal new building in Etterwinden

In the case of the new building in Etterwinden, the components in contact with the ground were first primed with D12 to seal them. After a scratch coat of RD1 Universal, the installer embedded the Glass Silk Mesh GS98 into the first, fresh waterproofing layer of RD1 Universal over the perimeter insulation. After complete drying of the first layer, the fabric was completely covered with the second layer RD1 Universal.